Projects

Projects

View All
On-Going Project
qatar qeic solar pv project
pv dc cable installation & terminations works (400mw), installation string invertors (400mw), installation of mv stations (400mw), rs terminations for trackers rotators (400mw), pvdc hot & cold side commissioning (400mw)
Client: Samsung C & T
On-Going Project
rtp trial project for bu378 bu hasa
pipeline route design, construction, testing and commissioning
Client: ADNOC Onshore Contractor. Baker Hughes
On-Going Project
epc for 30″ chilled water parallel network at yas island
design, procurement, construction & commissioning of pipeline
Client: TABREED
On-Going Project
early general activities for maximizing ethane recovery and monetization (meram) project
Client: NATIONAL PETROLEUM CONSTRUCTION COMPANY & TECNICAS REUNIDAS S.A. JV
On-Going Project
land fill pit contsruction works at beaat facility ruwais
Client: MAGMA Waste Treatment Services- Sole Proprietorship LLC
On-Going Project
saddiyat island cultural district remianing infrs. and lagoons artterial road – afc dc isolation chamber
supply and installtion of chw network for cultural district sadiyat island (pipe dia - 16" & length - 01 km)
Client: HILALCO
Completed Project
al dafra pv2 solar power project
pv dc cable installation, ternimations and associated civil works (2100mw), installation string invertors (2100mw), installation of mv stations (2100mw), ups installation (2100mw), rs terminations for trackers rotators (600mw), pvdc hot & cold side commissioning (200mw)
Client: CHINA MACHINERY ENGINEERING CORP
Completed Project
technology trial of reinforced thermo plastic (rtp) pipeline for oil flowline at shah
topographic survey for pipeline new route, installtion, tie-in & testing of 4” rtp flow line(4.5 kms) in shah field, leveling of groud of pipe ruote, leveling of groud of pipe ruote & open road cuttings
Client: ALI & SONS OIL-FIELD SUPPLIES & SERVICES COMPANY
Completed Project
sweihan solar pv power plant
installation of module mounting structure (mms), installation of pv modules , string formation/ looping, wye delta connector installation, installation of scbs (string combiner boxes) - 165 mw
Client: STERLING & WILSON
Completed Project
integrated gas development (igd-e) project
installation of cable trays (12.2 kms), power cable (35.1 kms), instrument cable (42.3 kms), grounding systems (3.2 kms), electrical equipments (2663 nos.) & electrical heat tracing (5.17 kms)
Client: Falcor engineering & contracting services
Completed Project
repair and reinstatement of assests damaged due to rain/flooding event 3rd march, 2016
repair and reinstatement of row/wadi erosion/bund with stone pitching/supply and installtion of gabion baskets from kp 340 to kp380, repair and reinstatement of cathodic protection (cp) system (cptp, ac mitigation, rxtp & ohtp), repair and reinstatement of (pipe sleepers, gravel, interlock tiles, asphalt road, etc) inside main oil terminal (mot) & repair and replacement of fiber optic cable (approx. 01 km length)
Client: TRANS MIDDLE EAST GENERAL CONTRACTING L.L.C.
Completed Project
mirfa independent water & power plant (iwpp) project
"erection of structural steel – 1200 ton fabrication, installtion & testing of gre piping– 08 kms"
Client: HYUNDAI ENC
Completed Project
integrated gas development expansion (igd-e) project – phase 1, onshore pipeline and habshan modifications
"erection of structural steel – 1200 ton fabrication, installtion & testing of gre piping– 08 kms"
Client: CONTROL APPLIACTION AND EMIRATES
Completed Project
installation & commsissioning of solar powered lighting at bab yard
excavation/backfilling works, pre-casting & installation of foundations/battery pits/covers, interlock tiles removal and reinstatement works, solar lightening poles with solar panels, solar lights, batteries (installation of solar lightening systems in all adnoc gp warehouses)
Client: EMIRATES ELECTRICAL & INSTRUMENT COMPANY
Completed Project
satah al razboot (sarb) field development project – package 4 epc work
consulatncy and supervision of mechanical works, iron work for steel structure, pipe fitting works, installtion of mechanical equipment’s, fabrication and erection of cs and ss piping & miscellaneous construction services
Client: HYUNDAI E&C
Completed Project
replacement of 16” & 24” condensate pipeline from hasbhan to ruwais kp-0+000 to 2+000
erection of bund and right of way for 16" condensate line pipeline (approx 150 kms)
Client: ESAAR OVERSEAS (PVT) LIMITED
Completed Project
integrated gas development expansion (igd-e) project – phase 1, onshore pipeline and habshan modifications
technical support for piping & structural steel fabriaction & erection, electrical and instrumentation works
Client: TECNICAS REUNIDAS S.A
Completed Project
waste heat recovery project
electromechanical & civil works
Client: SAMSUNG ENGINEERING
Completed Project
bab integrated facilities project
technical support for piping & structural steel fabriaction & erection, electrical and instrumentation works
Client: CPECC
Completed Project
bu hasa integrated field development project
camp refurbishment works & erection of recreational facilities
Client: TECNICAS REUNIDAS S.A
Completed Project
beaat expansion project
technical support for piping & structural steel fabriaction & erection, electrical and instrumentation works
Client: INTECSA INDUSTRIAL
Completed Project
development of low energy desalination plant technology optimised for middle east project
complete mechanical installtions for deslaination plant
Client: DAEWOO E&C
Completed Project
annual turn around habshan-0 2021
removal and re-insatllation of valves for refurbishment works during plant shutdown (130 vlaues of various sides)
Client: DESCON ENGINEERING
Completed Project
hc flare line location ot its original position
process piping modification (30 inch header and interconnecting branches i.e 10", 8" & small bore)
Client: FALCOR ENGINEERING
Completed Project
rtp flow line replacment bu 324
excavation/backfilling, 6"rtp flowline erection, berm/row, tie ins works (2.75 kms)
Client: FUTURE PIPE INDUSTRIES
Completed Project
rtp flow line replacment bu 279
excavation/backfilling, 4"rtp flowline erection, berm/row, tie ins works (2.63 kms)
Client: ALI & SONS COMPANY
Completed Project
chw piping & ets connection works for znm in sadiayat island
epc for chw network & ets room works for zayed national muesum
Client: TABREED
Completed Project
dubai wte project
boiler tubes fabrication & erection works (welding works - 8571 dia inches)
Client: HITACHI - ZOSEN INOVA